Plastic products are more and more welcomed by the relevant manufacturers, and now the products of this kind of materials can be seen everywhere in the market, such as in the beverage industry, purified water industry and so on. A good product depends on good production equipment. A good plastic blow molding machine not only has a good production process, but also has a good quality of operators. Must have certain use and maintenance knowledge in the production. But in the actual production, the training of mechanical maintenance is not very comprehensive. Here are some suggestions for the maintenance of blow molding machine.
1. Before going to work, check the blow molding machine to see if there is any place to add lubricating oil.
2. Before the start of production, all parts of the machine should be checked to see if they are reliable. If any loose parts are found, they should be reinforced in time. To prevent adverse consequences.
3. Check whether the power supply, air pressure and water of the machine are normal before starting the machine.
4. At the beginning of the blow molding machine, check the relevant safety measures, such as checking whether the grating and emergency stop are normal.
5. Check whether the lamps and lighting devices related to the equipment are normal, and replace them in time if there is any damage.
6. Check whether there is air leakage or water leakage in relevant devices of the equipment.
7. Before the machine works, clean the machine first, and clean and maintain the mold at the beginning and end of the work.
8. The blow molding machine should be preheated for half an hour before it starts to run. If there is no problem after running for a period of time, it can be formally put into production.